NEW QUESTION 35
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.
- A. Add the agreement to the source list and mark itfor MRP relevance.
- B. Add the agreement to the quota arrangement and mark it for MRP relevance.
- C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
Answer: A,C
NEW QUESTION 36
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Control cycle
- B. Production supply area
- C. Rate routing
- D. Replenishment strategy
Answer: A
NEW QUESTION 37
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.
- A. At order release
- B. At order confirmation
- C. At order creation
- D. At order settlement
Answer: A,C
NEW QUESTION 38
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.
- A. Checking control must have an overall profile assigned in customizing.
- B. Indicator Relevant for finite scheduling must be set.
- C. PRT Availability check must be set.
- D. Checking rule and group must be assigned.
Answer: A,B
NEW QUESTION 39
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The plant-specific status
- B. The least restrictive status
- C. The cross-plant status
- D. The most restrictive status
Answer: D
NEW QUESTION 40
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.
- A. It is used by ATP to determine the priority of alternative components.
- B. It is used in MRP to determine the sequence in which materials are planned.
- C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- D. It is used by product costing to determine how costs are rolled up.
Answer: B,D
NEW QUESTION 41
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
- B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
- C. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
Answer: C
NEW QUESTION 42
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?
- A. Fill up based on the lot size procedure
- B. Fill up to the safety stock level
- C. Fill up to the reorder stock level
- D. Fill up to the maximum stock level
Answer: A
NEW QUESTION 43
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Material
- B. Plant
- C. Production version
- D. Work center
Answer: A,D
NEW QUESTION 44
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Continuous flow materials
- B. Co-products
- C. Waste products
- D. By-products
- E. Bulk materials
Answer: B,C,D
NEW QUESTION 45
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To provide timely updates of inventory management for the staged components
- C. To stage different components for a production line simultaneously
- D. To reduce the totalproduction lead time for along production line
Answer: A,B
NEW QUESTION 46
Where do you maintain the duration of a producton operation?
- A. Material master
- B. Routing
- C. Bill of material (BOM)
- D. Work instructions
Answer: B
NEW QUESTION 47
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use batch determination.
- B. Use the material where-used report.
- C. Use the material staging report.
- D. Use the batch information cockpit.
Answer: D
NEW QUESTION 48
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The planning strategy is infinite.
- B. The work center has several individual capacities.
- C. The Change Planning Direct on indicator is set.
- D. Alternative resources are fully occupied.
Answer: A,B
NEW QUESTION 49
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.
- A. Use a specific material group
- B. Use a specific MRP type.
- C. Use a specific material status.
- D. Use a specific MRP controller.
Answer: B,D
NEW QUESTION 50
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP Concur
- B. SAP Ariba
- C. SAP C/4HANA
- D. SAP Field glass
- E. SAP SuccessFactors
Answer: A,B,D
NEW QUESTION 51
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work Center BOM
- B. Sales Order BOM
- C. Functional Location BOM
- D. Class BOM
Answer: B,C
NEW QUESTION 52
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Requirements type
- B. Consumption sequence procedure
- C. Requirements profile
- D. Order type
Answer: A
NEW QUESTION 53
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Manual planning without check
- B. Consumption-based planning
- C. Forecast planning
- D. Material requirements planning
Answer: B
NEW QUESTION 54
......