Updated Oct-2021 Official licence for CPIM Certified by CPIM Dumps PDF [Q274-Q296]

Share

Updated Oct-2021 Official licence for CPIM Certified by CPIM Dumps PDF

Grab latest Amazon CPIM Dumps as PDF Updated on 2021


APICS CPIM Exam Syllabus Topics:

TopicDetails
Topic 1
  • Basics of Supply Chain Management
Topic 2
  • Strategic Management of Resources.
Topic 3
  • Master Planning of Resources

 

NEW QUESTION 274
The usual process is to start with the due date and, using the lead times, to work back to find the start date for each operation, this process is known as:

  • A. Back scheduling
  • B. Front scheduling
  • C. Liquidity scheduling
  • D. Fixed scheduling

Answer: A

 

NEW QUESTION 275
Something that has value and is expected to benefit the future operation of the business is known as:

  • A. Sales
  • B. Business Plan
  • C. Asset
  • D. Revenues

Answer: C

 

NEW QUESTION 276
In some industries, is the only strategy that can be followed. Farmers, for instance, must produce in the growing season. The post office must process mail over the Christmas rush and in slack seasons. Restaurants have to serve meals when the customers want them. These industries cannot stockpile or inventory their products or services and must be capable of meeting demands as it occurs.

  • A. Chase strategy
  • B. Resource Planning
  • C. Subcontracting
  • D. Production leveling strategy

Answer: A

 

NEW QUESTION 277
Which of the following are the purposes of material requirement planning so items in the master production schedule are made on time?

  • A. To determine the components needed
  • B. All of the above
  • C. To determine the due dates
  • D. To determine the quantities

Answer: B

 

NEW QUESTION 278
Basic concepts in TQM:

  • A. A committed and involved management
  • B. All of these
  • C. Focus on the customer
  • D. Involvement of the total workforce

Answer: B

 

NEW QUESTION 279
On the overage a company has 12week of work-in-process (WIP) inventory and annual cost of goods sold of 36$ million. Assuming the company works 50 weeks per year. If the WIP could be reduced to 5week, and the annual cost of inventory value what would be annual savings?

  • A. $504,000
  • B. $500,400
  • C. $50,000
  • D. None of these

Answer: A

 

NEW QUESTION 280
What is concerned with removing work content, not with spending money on better and faster machines?

  • A. Improving productivity
  • B. Increasing volume
  • C. Continuous process improvement
  • D. Continuous project improvement

Answer: C

 

NEW QUESTION 281
What exist because of the time needed to move goods from one location to another such as from a plant to a distribution center or a customer?

  • A. Operating inventories
  • B. Pipeline inventories
  • C. Cyclic inventories
  • D. Stable inventories

Answer: B

 

NEW QUESTION 282
A tool to map and understand the flow of materials from supplier to customer, focusing on not only understanding the current state of process and flow but also specifying the value-added and non-value-added time of all process steps, is called.

Answer:

Explanation:
Value stream mapping

 

NEW QUESTION 283
Government regulations majorly apply to areas as:

  • A. Environment and taxation
  • B. Population growth
  • C. All of these
  • D. Product liability and safety

Answer: A,D

 

NEW QUESTION 284
The formula to calculate the Target value is:

  • A. T = D (R + L) * SS
  • B. T = D (R -) / SS
    Where T = target level, D = demand pr unit of time, lead-time duration, R = reviewperiod duration, SS = safety stock
  • C. T = D (R + L) + SS
  • D. T = D (R -L) + SS

Answer: C

 

NEW QUESTION 285
The operation that controls the work feeding the bottleneck and must operate at a rate equal to the utput of the bottleneck so the time buffer queue is maintained is known as:

  • A. task operation
  • B. gateway operation
  • C. Control buffer operation
  • D. bottleneck operation

Answer: B

 

NEW QUESTION 286
Multilevel bills are formed as:

  • A. Both A & B
  • B. Logical grouping of parts into subassemblies based on the way the product is assembled.
  • C. To make identification of the part absolute
  • D. Overall design for the arrangements of bills

Answer: B

 

NEW QUESTION 287
A load made up of a number of items or bulky material, arranged or constrained so the mass can be picked up or moved as a single unit too large for manual handling in called:

  • A. Pallet load
  • B. Unit load
  • C. Package load
  • D. Contemporary load

Answer: B

 

NEW QUESTION 288
With the explosive growth in just-in-time (JIT) concepts, the supplier-customer partnership concept grew as a result many changes in their relationships came including:

  • A. Need for rapid delivery
  • B. Mutual product design
  • C. Speed of accurate information flow
  • D. Mutual analysis for cost reduction

Answer: C

 

NEW QUESTION 289
Inventory must be sorted and the same parts collected together so they can easily be counted, this is called:

  • A. Housekeeping
  • B. Recording
  • C. Recordkeeping
  • D. Bookkeeping

Answer: A

 

NEW QUESTION 290
For effective planning:

  • A. There must be a balance between priority and capacity
  • B. Priority should be given more importance than capacity
  • C. Capacity should be given more importance than priority
  • D. None of these

Answer: A

 

NEW QUESTION 291
A distributor has decided to implement push replenishment throughout its network. Which action is most consistent with this decision?

  • A. establishing a bill of distribution
  • B. establishing safety stocks
  • C. establishing lead times
  • D. establishing double order points

Answer: A

 

NEW QUESTION 292
The purchase cost of the stock-keeping units or the cost of manufacturing the item is called:

  • A. Key cost
  • B. Unit cost
  • C. Elementary cost
  • D. Economic cost

Answer: B

 

NEW QUESTION 293
Forecasts are more accurate for larger groups of items than for individual items in a group?

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 294
In bills of Material structure; Summarized parts list:

  • A. It's the list of comments are linked to their parents by listing them immediately below the parents
  • B. The lists of all the parts needed to make one complete assembly
  • C. Both A & B
  • D. Does not contain any information about the way the product is made or assembled

Answer: C

 

NEW QUESTION 295
Purchasing and production activity control:

  • A. is very short, perhaps from a day to month
  • B. Plans are reviewed and revised daily
  • C. the level of detail is high since it is concerned with individual components, workstations and ordered
  • D. All of these

Answer: D

 

NEW QUESTION 296
......

Latest CPIM Exam Dumps APICS Exam from Training: https://www.realvce.com/CPIM_free-dumps.html

Newly Released CPIM Dumps for APICS Certification Certified: https://drive.google.com/open?id=12i16iI3ECjL_YI5rew4w62eoLjtnLFCn