NEW QUESTION # 23
What can a technician do to ensure that no malicious code can be introduced into any of the servers through physical access?
- A. Set UEFI Variable Acces to disabled
- B. Set Secure Boot Policy to enabled
- C. Set USB 3.0 to disabled
- D. Set User Accessible Ports to disabled
Answer: D
NEW QUESTION # 24
A technician needs to install the OS on a server remotely using iDRAC.
What is the minimum iDRAC license required to perform this task?
- A. Enterprise
- B. Express
- C. Baseboard Management Controller
- D. Basic
Answer: A
NEW QUESTION # 25
A technician replaces a faulty system board on a server. In addition to powering on the system, what step must the technician take to install the correct service tag?
- A. Type asset <asset tag> to change the asset tag
- B. When prompted by Easy Restore, press Y to restore the Service Tag, license, and diagnostics information
- C. Login in to the iDRAC
- D. Press F11 to start the Boot Manager
Answer: B
NEW QUESTION # 26
Refer to the exhibit.
A technician is testing basic SMTP alerts on an iDRAC for a server. The test SMTP alerts fail with the message shown. The technician can ping the hostname of the SMTP server from their workstation.
Which two actions should the technician take to fix the issue? (Choose two.)
- A. Add iDRAC hostname to the SMTP server hosts file
- B. Verify SMTP port settings on the iDRAC
- C. Enable the SMTP Client service on the iDRAC
- D. Use the IP address of the SMTP server
Answer: B,D
NEW QUESTION # 27
A technician deletes the iDRAC Enterprise license on a R640 server.
Which license type is then enabled?
- A. iDRAC will not have a license until a new one is installed
- B. iDRAC Express license
- C. iDRAC Enterprise license cannot be deleted
- D. iDRAC Basic license
Answer: D
NEW QUESTION # 28
A technician resets the iDRAC but when they attempt to log back in to the iDRAC is offline.
Why is the iDRAC offline?
- A. DRAC has reset to the default IP address of 192.168.0.120
- B. Technician must move the iDRAC network cable back to the iDRAC dedicated NIC
- C. iDRAC is still in the reset process
- D. Technician must use iDRAC Direct to enable the iDRAC network
Answer: D
NEW QUESTION # 29
A technician working with a Dell EMC PowerEdge 1 take corrective action?
- A. Check the LCC Log
Check PSU LED
Reseat the PSU - B. Check the System Event Log
Check PSU LED
Do a virtual reseat of the iDRAC - C. Check the LCC Log
Check PSU LED
Reseat the CPU - D. Check the System Event Log
Check PSU LED
Reseat the PSU
Answer: B
NEW QUESTION # 30
A technician is configuring a PowerEdge R640 that has two PSUs. The rack in which it is being installed has two power distribution units (PDUs). No high power such as GPUs are required. The user wants as must redundancy protection as possible.
What is the best way to configure the PSUs?
- A. Redundancy Mode set to 1+0 with the second PSU stored nearby for quick replacement if the first PSU fails
- B. Redundancy Mode set to 1+1 with each PSU power cords connected to a different PDU
- C. Redundancy Mode set to 2+0 with each PSU power cord connected to a different PDU
- D. Redundancy Mode set to1+1 with both PSU power cords connected to the same PDU
Answer: B
NEW QUESTION # 31
A technician has a rack mount server with 20, 200 GB drives installed. The administrator needs three different RAID 5 virtual disks that are each 600 GB in size. All virtual disks must utilize the same set of physical disks.
How should the technician meet this requirement?
- A. Create a single disk group using 6 drives
Assign the virtual disks via the Lifecycle Controller - B. Create a virtual disk using 10 drives that are 600 GB in size
Split the remaining space into two virtual disks - C. Create three disk groups using 9 drives that are each 600 GB in size Add virtual disks to each disk group
- D. Create three virtual disks that are each 600 GB in size
Assing these disks to the same disk group via Lifecycle Controller
Answer: B
NEW QUESTION # 32
Refer to the exhibit.

A system administrator wants to monitor information about the system using their smartphone and a Bluetooth connection. LED labeled 3 on the control panel is solid white.
What does the LED indicate?
- A. The system is in failsafe mode.
- B. Quick SYNC 2 is ready to communicate.
- C. OMM is transferring data.
- D. The system is powered on.
Answer: B
NEW QUESTION # 33
Which mobile devices are supported by Quick Sync in 13G Dell EMC PowerEdge servers?
- A. iOS, Android, and Windows Phone devices
- B. Android devices only
- C. iOS devices only
- D. iOS and Android devices only
Answer: B
NEW QUESTION # 34
A technician is installing a new server and is not getting any link lights on the iDRAC management port. They have verified that the cable and switch port are working.
What could be causing this issue?
- A. iDRAC has been disabled in the Lifecycle Controller
- B. iDRAC firmware update is currently in progress
- C. IP has not been set in the Lifecycle Controller
- D. NIC selection is set for Shared LOM
Answer: B
NEW QUESTION # 35
What is required for iDRAC Direct 2.0 to connect with IDRAC9 interfaces such as RACADM and WSMAN?
- A. Wi-Fi connection
- B. Micro-AB USB
- C. Ethernet cable
- D. NFC connection
Answer: B
NEW QUESTION # 36
A server is being up as a VMware ESXi host. A technician needs to install the OS on an internal SD card. They install the SD card. However, during OS installation, the SD card is not visible.
What should the technician do to fix the issue?
- A. Enable the SD card in the BIOS Settings
- B. Use Lifecycle Controller to install the SD card
- C. Format the SD card with an EXT3 partition before installation
- D. Move the SD card from slot 2 to slot 1
Answer: A
NEW QUESTION # 37
Which application reduces the manual effort to update 500 Dell EMC PowerEdge R750 servers?
- A. OpenManage Enterprise
- B. iDRAC9
- C. Lifecycle Controller
- D. OpenManage Server Administrator
Answer: A
NEW QUESTION # 38
A company has an environment with multiple AD forests in a one-way trust relationship. The AD provider on the cluster is configured with SFU.
The trusted domains are failing to supply UIDs and GIDs to the Dell EMC Isilon cluster. As a result, users from the trusted domain are receiving an "access denied" error message.
What is a possible reason for the denial?
- A. Transitive external two-way trust is required for cross domain lookups.
- B. Non-transitive external two-way trust is required for cross domain lookups.
- C. Transitive forest trust is required for cross domain lookups.
- D. Non-transitive forest trust is required for cross domain lookups.
Answer: D
NEW QUESTION # 39
What operation should a technician perform to ensure configuration recovery if a server must be physically replaced?
- A. Create and export a Server Configuration Profile
- B. Back up the Server Profile to a network share or vFlash SD card
- C. View and export the current hardware inventory
- D. Enable the export configuration option in System Setup
Answer: B
NEW QUESTION # 40
A technician needs to configure a server to PXE boot a server setup image with the BIOS in UEFI mode.
Which two steps should the technician perform to enable this function? (Choose two.)
- A. From System Setup Utility, choose Device Settings. Configure NIC for PXE.
- B. From the iDRAC web interface, select Network Settings, and enable PXE Device1.
- C. Boot to Ctrl+S and configure the NIC for PXE Device1.
- D. Navigate to Network Settings, PXE Device1 Settings, and configure IP.
- E. Navigate to Boot Options Settings and set PXE Device1 as first option.
Answer: C,E
NEW QUESTION # 41
What is the prerequisite for using BIOS Live Scanning?
- A. Enable X2APIC mode
- B. Server with Ice Lake processor
- C. Enabled Secure boot
- D. iDRAC Datacenter license
Answer: D
NEW QUESTION # 42
......