Many people know getting Cisco certification is very useful for their career but they fear failure because they hear it is difficult. Now I advise you to purchase our 300-110 premium VCE file. If you are not sure you can download our 300-110 VCE file free for reference. Please trust me if you pay attention on our 300-110 dumps VCE pdf you will not fail. We can guarantee you pass 300-110 exam 100%.
Why do we have this confidence to say that we are the best for 300-110 exam and we make sure you pass exam 100%? Because our premium VCE file has 80%-90% similarity with the real Cisco 300-110 questions and answers. Once you finish our 300-110 dumps VCE pdf and master its key knowledge you will pass 300-110 exam easily. If you can recite all 300-110 dumps questions and answers you will get a very high score. Our standard is that No Help, Full Refund. No pass, No pay.
Instant Download: Our system will send you the 300-110 braindumps file you purchase in mailbox in a minute after payment. (If not received within 12 hours, please contact us. Note: don't forget to check your spam.)
Cisco 300-110 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Wireless Site Survey | 25% | - Collect design requirements and evaluate constraints - Planning tools and network metrics evaluation - Predictive site survey - Pre-deployment site survey - Layer 1 site survey analysis - Material attenuation and its design effects - Post-deployment site survey |
| Topic 2: Mobility | 25% | - Design mobility groups - Validate mobility tunneling - Optimize client roaming - Site Tags |
| Topic 3: WLAN High Availability | 20% | - Design AP high availability - Design controller high availability |
| Topic 4: Wired and Wireless Infrastructure | 30% | - Design radio management - Design for data, voice, video, location - Logical infrastructure requirements - Design wireless bridging (mesh) - Physical infrastructure requirements - Design high-density wireless networks |
Cisco Designing Cisco Wireless Networks Sample Questions:
1. An engineer is deploying new APs to serve IEEE 802.11g through 802.11ac clients and wants to use the Ekahau Site Survey tool to verify RF coverage. Management wants the engineer to verify and create coverage maps as quickly as possible. Which configuration accomplishes the goal?
A) active mode with two wireless adapters
B) active mode with one wireless adapter
C) passive mode with one wireless adapter
D) passive mode with two wireless adapters
2. A customer has multiple WLCs running in N+1 redundancy with APs load balanced between the WLCs. The customer performs AP failover testing between the WLCs and notices that some of the APs do not move back to their primary WLC after it recovers. What are two points that must be addressed in the design? (Choose two.)
A) APs do not have their primary WLC information configured correctly.
B) DHCP Option 43 information is incorrect.
C) APs failover priorities are set to Low.
D) APs do not have their secondary WLC information configured correctly.
E) AP Fallback is not enabled on one of the WLCs.
3. An enterprise is using wireless as the main network connectivity for clients. To ensure wireless network availability, two standalone controllers are installed in the head office. APs are connected to the controllers using a round-robin approach to load balance the traffic. After a power cut, the wireless clients disconnect while roaming. An engineer tried eping from the controller but fails. Which protocol needs to be allowed between the networks that the controllers are installed?
A) IP Protocol 77
B) IP Protocol 87
C) IP Protocol 67
D) IP Protocol 97
4. A customer has two Cisco wireless controllers named WLC-A and WLC-B. Each controller is in a different building on a campus. The WLCs have different Layer 3 interfaces and broadcast the same SSIDs from their respective APs. Users must remain connected to the same VLAN and maintain their IP addresses during roaming from the APs attached to WLC-A and WLC-B. Which action accomplishes the requirement?
A) Create a mobility group between the two WLCs to allow auto-anchoring.
B) Enable 802.11r on each SSID on both WLCs to allow caching of the PMK.
C) Enable AP groups using the same name on both WLCs for each group.
D) Create an SSO cluster to ensure that client sessions sync between WLCs.
5. A consultant must design a WLAN for a large campus with high AP density, 50-100 clients per cell, 5 Mbps throughput per client minimum, 5 GHz and 2.4 GHz coverage at -67 dBm, and no 802.11b clients. Which two WLAN design approaches meet the requirements? (Choose two.)
A) Enable 802.11b data rates.
B) Set the 5 GHz channel widths to 80-160 MHz.
C) Configure up to six SSIDs on any AP.
D) Reduce the 2.4 GHz coverage with FRA.
E) Set the minimum mandatory data rates to 12-18 Mbps.
Solutions:
| Question # 1 Answer: D | Question # 2 Answer: A,E | Question # 3 Answer: D | Question # 4 Answer: A | Question # 5 Answer: D,E |



